Story
Trending

Residents report home damage after HS2 tunnelling in west London

Business · First reported 1 Nov, 16:55 · Updated 17:31

Image: Wikimedia Commons · NASA Johnson Space Center · Public domain

Residents near Queen’s Park say cracks and subsidence in their homes worsened after HS2 tunnelling; HS2 says monitoring found ground settlement was small and within expectations.

  • Residents on Claremont Road and Kilburn Lane said cracks appeared or worsened after a tunnel boring machine passed underground between August 30 and September 13.
  • Brent Council arranged scaffolding at one property, and ground-floor tenants there were moved to alternative accommodation.
  • HS2 said it would compensate where tunnelling had a material impact on a property, and said monitoring showed settlement was small and in line with expectations.
Summary written by Lux AI from 2 articles

Key facts

Location
Near Queen’s Park Station, west London
Reported tunnelling period
August 30 to September 13
Reported depth
About 18 metres underground
Properties cited
Claremont Road and Kilburn Lane
HS2 position
It said monitoring showed small settlement in line with expectations and that it would compensate for material impacts.

Source spectrum

Far left
Left
Lean left
Centre
Lean right
Right
Far right

Left 0 · Centre 0 · Right 2 of 2 rated sources

Images from the coverage

Image: GB News
Image: Daily Mail

All coverage

Coverage over time

011618202200
LeftCentreRight

Articles per hour since first reported, by side.

Ownership

  • Billionaire 50% (1)
  • Corporation 50% (1)

Share of the 2 sources by owner type.