Residents report home damage after HS2 tunnelling in west London
Business · First reported 1 Nov, 16:55 · Updated 17:31

Residents near Queen’s Park say cracks and subsidence in their homes worsened after HS2 tunnelling; HS2 says monitoring found ground settlement was small and within expectations.
- Residents on Claremont Road and Kilburn Lane said cracks appeared or worsened after a tunnel boring machine passed underground between August 30 and September 13.
- Brent Council arranged scaffolding at one property, and ground-floor tenants there were moved to alternative accommodation.
- HS2 said it would compensate where tunnelling had a material impact on a property, and said monitoring showed settlement was small and in line with expectations.
Summary written by Lux AI from 2 articles
Key facts
- Location
- Near Queen’s Park Station, west London
- Reported tunnelling period
- August 30 to September 13
- Reported depth
- About 18 metres underground
- Properties cited
- Claremont Road and Kilburn Lane
- HS2 position
- It said monitoring showed small settlement in line with expectations and that it would compensate for material impacts.
Source spectrum
Left 0 · Centre 0 · Right 2 of 2 rated sources
Images from the coverage


All coverage
Coverage over time
LeftCentreRight
Articles per hour since first reported, by side.
Ownership
- Billionaire 50% (1)
- Corporation 50% (1)
Share of the 2 sources by owner type.